Factory machinery import logistics: plan delivery and installation handover

Coordinate equipment packing, import documentation, rigging interfaces and the installation team’s receiving sequence.

Split transport and installation interfaces

Agree where the forwarder’s scope ends and the installer’s begins. Check special tools, crane availability and areas for temporary staging. Ask the manufacturer for handling instructions before preparing the shipment.

Sequence deliveries by installation need

Identify pieces needed early and separate spare parts and consumables in the packing list. Define a receiving signoff so any shortage or damage is recorded before the installation team takes over.

Ready-to-use checklist

  • Installation sequence and staging space
  • Weight, drawings and handling instructions
  • Responsibility and signoff at delivery